Northfield BIM review

Existing-conditions model · November 26, 2026

The public viewer opens with the built-ins and an empty movable-furniture layout. The editor uses the existing owner’s Google sign-in. Download the IFC used by this viewer.

Basement bathroom

The revised bathroom measures 51 in wide by 85 in long in the IFC. The 35.5 in shower opening and 28.5 in from the outer curb to the bowl follow the original tour panorama. The photo follow-up reduced the toilet's front-to-back depth to an estimated 26 in. A 20 by 30 in mat placed 2 in from the curb leaves 6.5 in beside the bowl. These dimensions await field verification.

Compare the earlier geometry, revised IFC and panorama

Laundry chute and geometry cleanup

The rear-right bedroom bench has an inset lid and latch, and the wood hatch beside the refrigerator feeds into the same drop. The IFC check found a clear modeled route to the top of the basement laundry ceiling. The concealed route and actual outlet still need field verification. View the modeled chute section.

Removed two duplicate fence post copies and five unused wall solids. The browser export now reuses identical points within each mesh. Eight local before-and-after views matched pixel for pixel, and the editing checks passed.

West fireplace chimney

The modeled masonry connects the basement, twin fireplaces, primary bedroom and roof stack. The estimated 21 × 31 in bedroom footprint moves the painted breast 8.2 in into the room. The finished projection, concealed masonry and liner routes require field verification. IFC continuity section.

November 11 model update

Four areas remain at 94% on the photo-match scorecard. They are the basement bathroom, shallow service closet, kitchen-to-foyer hall and attic deck and framing. The garage reached 95% after the window recheck.

The exterior model now has paving across both garage thresholds, corrected kitchen and office roof joins, separate foundation finish faces and a fence that clears the rear deck. The apron material transition, flashing, base profile and fence clearance need field measurements. The rear utility window’s clearance below the deck also needs field verification.

Kitchen, front hall and basement access

In the first-floor walkthrough, choose Hall to look toward the foyer or Side entry to look down the basement stairs.

Before and after views of the ceiling above the side door and the soffit above the basement stairs
White ceiling and soffit revision. A flat finish covers the underside of the intermediate landing above the side door. A sloped finish covers the lower main flight above the basement stairs. The upper landing still meets the second-floor deck at the same elevation.
Listing photo 12, matching model view and overlaid ceiling and stair edges
2025 listing photo 12. A flat white ceiling and smooth sloped soffit conceal the underside of the staircase to the second floor. This overlay compares the photographed finish to the exposed stair in the prior IFC. Camera and trace data
Kitchen, foyer route and side-entry basement stair before and after coordination
Published model revision. The cased opening beside the range leads into the slate-floored hall. The restored wall blocks the old opening behind the range. The lower flight is visible from the side-entry walkthrough.

The photo 12 fit used ten kitchen references and reached 2.7 pixels RMS at source size. The deck door is offset in the render. The photo establishes the visible finish and its apparent edge. The revised soffit profile follows the modeled stair envelope pending measurement.

Stair sash and earlier photo matches

The main stair sash now has six upper lights above one lower light, dark stained timber inside and pale exterior trim. The window retains its hosted opening. Tour 15, tour 19 and the driveway close-up establish the pattern and finish. The looser stair-turn fit leaves the overhead shape provisional.

Rear deck and steps

The closer office-side review restores the glass-block window and its central upper vent, moves the window and opening about 3¼ feet toward the office, and coordinates the condenser with the same photographs. The steps run outward from the main wall and turn at a paved landing into the office door. Gray tread centers, brick nosings, soil banks and rough stone edging follow the inspection views. The camera fit depends on estimated landing dimensions, so window offsets and ground levels need measurement. Registered window comparison · Camera and reference data.

The office garden entrance review combines the inspection Steps-Landings photograph with both Cooling Equipment views. The condenser sits against the main house wall, rearward of the glass-block window, with the office brick steps farther along that wall. The side fence now ends at its return. Select Exterior → Eye-level walkthrough → Office garden steps to see the arrangement or Outdoor condenser for the equipment. Unit offsets, steps and nearby grades remain estimates. Inspection photographs and model view.

Photos 38 and 39 show a fence leg beside the deck before it turns toward the side boundary. The revised fence follows that arrangement. Its modeled turn is about seven feet from the house and the side fence is four feet farther outward. Fence offsets and the office passage width remain photo estimates. Fence photos and plan detail.

The photo-matched model extends the raised landing and the lower deck into the yard. It shows three main treads to the patio, the broad lower step and its short return near the gravel bed, and the visible rails and riser lights. Select Exterior → Eye-level walkthrough → Rear patio for the updated view. Deck dimensions, risers and the retaining-wall tie-in are estimates. Before-and-after photo match.

Garage from the back porch

Facing the garage from the porch, the white service door is ahead and the two overhead bays are on the left wall. Inside the white door, the workbench and its six-light sash are on the right. The blind-covered sash is straight ahead. Both window offsets and exterior casing details need a field check.

See both window walls in the garage audit views.

The gable infill now follows the centered roof ridge and sits below the roof surface. The white service door has six lights in two rows. Its hosted opening retains its modeled position. Service-wall photo match and before-and-after views.

Utility room and Full walls view

The utility room has a 3D model of the Navien NWP500-50 heat pump water heater, using the manufacturer's 21.7-inch cabinet width and 63-inch height. In the basement walkthrough, choose Utility to see it. The room overview in Full walls hides ceiling panels so the layout remains visible. The ceilings still appear in the eye-level walkthrough.

The basement also models the Amana ARVM970603BNAA furnace and the AprilAire Model 2400 media air cleaner beside it. The Goodman GSX130301LC outdoor unit is visible under Exterior → Eye-level walkthrough → Outdoor condenser. The inspection photos guide the visible finishes, duct transitions and equipment pad. Installed details are approximate.

Coordination and verification

The current IFC passed schema and opening checks. The soffit is a separate finish. Section probes checked the flat finish against the turning landing, the sloped finish below the stair, the side wall and the second-floor arrival. The room review ran 650 stair and hall route probes. The exterior audit separately rendered 14 views and checked 26 wall faces, both garage gables and the repaired rear corner.

Field measurements still needed

The lowest sampled basement-route headroom is now 74.1 inches along the centerline near the lower end of the basement flight. The earlier model sampled 81.6 inches at the side entry with the stair underside exposed. Both readings are model estimates. The installed soffit and actual headroom still need measurement.